CONTACT US

Tel: 0086-371-63313738
E-mail: market@hxjq.com

Industry News

You are here: Home > Industry News > News Center

First step, first step, and what is the first to start crusher

AUTHOR: admin       DATE: 17 Feb 2012 07:12:57

Normal use guarantee jaw crusher continuous work normally one of the important factors, improper operation or do some exercises in the process of the careless, is often cause equipments and personal accident important reasons. The correct operation is strictly according to the provisions of the operation procedures.

Before the start of the preparation: in the jaw crusher, must on the equipment before start full check carefully: check the broken tooth board wear, adjusted the row of ore mouth size; Check for broken cavity ore, if there is a chunk of ore, must be removed. Links are loose bolts; Pulley and the protection of the flywheel outer garment is complete; The triangle leather belt and ties of spring is the right degree of elasticity; Storage tank (or dry oil storage for the amount of oil) oil filled with degree and lubrication system in good condition; Electrical equipment and signal system is normal, etc.

In the startup crusher, should first start before oil pump motor and cooling system, the three to four minutes, when oil pressure and oil, then start when normal indicator of the crusher motors.

Later, after the launch of starting crusher over a period of time, the workshop can start to run for ore equipment. The crusher of ore to should be gradually increase until full operation.

Operation must be paid attention to, not even ore minerals packed with crushing cavity, and give a crazy piece of the largest size should not be more than 0.85 times width mouth to mine. At the same time, to defend excavator shovel teeth of ore and rig drills have not broken objects into crusher. Once found that these objects into the broken crushing cavity, and through the machine row, ore mouth shall immediately notify the belt transport in time, lest post out into the next paragraph crusher, cause serious equipment accidents.

The operating process, often pay attention to big ore blocks stuck to mine the mouth, crusher if has stuck, be sure to use iron hook to flipping ore, if the bulk ore from breaking out of need cavity, should by special appliance, rigorous hand to work on these, lest produce an accident.

Related Articles:
Service Matters Gradually with Enterprise ProsperityResearch on the role of Jaw crusher in limestone production lineEnvironmental Jaw Crusher Reuses Blast Furnace Slag Hongxing Jaw Crusher Is Moving Toward Technical PinnacleThe Do's and Don'ts When Use Jaw CrusherWhat Elements Restrict Production Efficiency of Jaw Crusher?

| Contact Us | Sitemap | Sitemap.xml | RSS
Tanxiang Road, High & New Technology Industries Development Zone of Zhengzhou, China